Minutes from SV-AC Committee Meeting
Date: 2016-03-09
Time: 17.00:00 UTC (9:00 PST)
Duration: 1 hour
Agenda
- Reminder of IEEE patent policy
See: http://standards.ieee.org/board/pat/pat-slideset.ppt
- Minutes approval
- Email ballot results
- Mantis 3672: hierarchical access to named block in assertion action blocks
- Mantis grading (4037, 5476, 5517, 5520, 5549, 5551)
- Mantis 5548: Non-degeneracy: limitations and references
- Opens
Attendance Record
Legend:
x = attended
- = missed
r = represented
. = not yet a member
v = valid voter (2 out of last 3 or 3/4 overall)
n = not a valid voter
t = chair eligible to vote only to make or break a tie
Attendance re-initialized on 2016-03-09:
v[x] Shalom Bresticker (Accellera)
v[x] Eduard Cerny (Synopsys)
v[x] Ben Cohen (Accellera)
t[x] Dmitry Korchemny (Synopsys - Chair)
v[x] Manisha Kulshrestha (Mentor Graphics)
v[x] Anupam Prabhakar (Mentor Graphics)
v[x] Erik Seligman (Intel – Co-chair)
v[x] Samik Sengupta (Synopsys)
|- attendance on 2016-03-09
|--- voting eligibility on 2016-03-09
Minutes
IEEE patent policy reminder
Minutes approval
Ben: Move to approve the minutes from SV-AC meeting 2016-02-24.
Ed: Second
Vote: 7y/0n/0a
Meeting minutes have been approved.
Email ballot results
The vote on 5511 was positive, but there were several friendly amendments and the proposal was amended several times.
Manisha explained changes made in the proposal.
Anupam: Move to voice vote to accept the proposal.
Ed: Second.
Vote: 7y/0n/0a – proposal accepted
Mantis 3672: hierarchical access to named block in assertion action blocks
Ed: The proposal is ready to vote.
Shalom: My issues are also ready for voting (4041, 5520, 5572)
Mantis 3117: make it clear that rewriting algorithm (F.4.1) applies to checker and let
Manisha: I uploaded a proposal. Need a reviewer.
Mantis 4037: Define false vacuity and contributions to pass/fail counters in simulation
Ben: The reason to handle this proposal in this PAR is the undefined behavior for coverage counting in presence of vacuity in some cases.
Ed, Dmitry: This is, indeed, a conceptual problem. However, it does not happen in practice.
Ed: E.g., a property with double negation will behave differently.
Dmitry: Need more discussion for this item.
Mantis 5548: Non-degeneracy: limitations and references
Ben: The industrial simulators not always impose the non-degeneracy rule.
Dmitry: The existing non-degeneracy condition prevents several rewriting rules. Followed-by with a degenerate sequence cannot succeed.
Manisha: However, according to current definition, followed-by should require a non-degenerate antecedent. Need to make this requirement explicit.
Comments