Thanks Kev. I would like to take this opportunity to re-emphasize (Dave had
a similar comment I think) that "verification phase" seems to encompass 2
different things: assertion checking, and "testbench" stimulus. I would like
to see a clear separation of these two: may be have "Design", "stimulus code
(a better name needed)", "assertion (better name needed)". Also, it is a bit
disconcerting that (as I understood the presentation) $monitor task and
"assertion" were in different slots, and would give different results. The
latter after "stimulus", the former before. I would think users would not be
happy with this, and in general not sure that it makes sense.... reasonable
people can disagree, but it has to be backward compatible... Also btw, I
neglected to mention that conceivably assertions need to access the state
of -variables- in the stimulus much like they do design (if indeed we think
of everything together, after all that is the intent of putting the whole
language together, right ???), so really I think assertions should be last
in a time step, again $monitor, convincing ? In any case, splitting the two
things -clearly- would be better for discussion.
Indeed Peter, Surrendra, and the guys, and Jay's feedbacl did a great job
brainstorming on the scheduling aspects I hope we can have a detailed
write-up and some discussion on this again soon.
Salam,
-Bassam.
P.S. HaPpy Eid (end of Ramadan) to all ! Have a good Friday, and a great
weekend!
-- Dr. Bassam Tabbara Technical Manager, R&D Novas Software, Inc.http://www.novas.com (408) 467-7893
-----Original Message----- From: owner-sv-ac@server.eda.org [mailto:owner-sv-ac@server.eda.org]On Behalf Of Kevin Cameron x3251 Sent: Friday, December 06, 2002 9:38 AM To: sv-ec Cc: sv-ac@server.eda.org Subject: [sv-ac] Verification phase
After Peter's presentation on the program block and Jay's comments about "preponed" processes, I was wondering if it would help to look at the problem of placing the "verification phase" slightly differently. Since the simulator usually has to maintain sensitivity lists for signals for evaluating all the "@(..." statements, you could (partially) sort the lists so that some processes are evaluated before others. All you would need to do then is tweak the sensitivity statement syntax to put the sensitive process earlier on the list if it is a verification process, e.g.:
always @+(clock) // super-sensitive assert ...; // check data
always @(clock) begin // process data q = d;
- the assertion would always be processed first.
While you could have more levels of sensitivity, two levels maps to front and back of a list so implementation might be quite easy.
Just a thought, Kev.